Sample of Projects

Decanter project

Client: nestle-6th of October.
Scope Brief Description:
-Doing all power & control work for exchange station
-Connect it with PLC & Scada system
-Maintenance the station for a year after work.

Earth project

Client: Mondelez factory (Borg El Arab)
Scope Brief Description:
-Exchange the old earth network with a new one and doing all tests to ensure that all readings are in range.

Independence project

Client: Mondelez factory Borg El Arab
Scope Brief Description:
-Doing all power work to a new line for making gum
-Connecting 3 new generators & some transformers modifications
-Control work for operating (high coater, coating pan, IPial) M/C

Mega project mondelez

Client: Mondelez 10th of Ramadan
Scope Brief Description:
-Doing all cable trays, cable ladder, cable basket for a new chocolate line in mega building.
-Install all power cables to the project.
-Install all control cables to the project connect the cables with plc & scada system.

Mars project

Client: Mars 6th of October
Scope Brief Description:
-All lighting work in the twix line.
-All light current working for the line.
-Fire alarm (CCTV, motion detector).
-Install power & Control cables.

Baby care product line control panel

Client:Olayan Kimberly-Clark- Bahrain W.L.L
Scope Brief Description:
-Supply; design; testing and commissioning of 2 baby care product
line control panels as per client requirement
-Supervising installation and SAT test as per SAT test procedure.
-Supporting in site commissioning and startup

Nubian Corner& Arabic Corner project

Client: Proctor & Gamble Egypt
Scope Brief Description:
-Supply & install Nubia Corner & Arabic Corner.
-Supply & install power & light for the 2 corners.
-Pulling cables, Conduits, Termination.
-Land Scape working (Artificial grass, interlock)

PLC CONTROL SYSTEM MAIN PANEL

Client: Proctor & Gamble Egypt
Scope Brief Description:
-Troubleshooting and maintenance of product line control panel
-Recover all mechanical and electrical equipment damage
-Dressing and marking cables as per original design drawing
-Apply mechanical and operational testing
-Apply all required electrical; megger and continuity testing
-Apply FAT test in presence of client as per standard FAT procedure

PLC CONTROL SYSTEM PANEL for baby care product line.

Client: Proctor & Gamble Egypt
Scope Brief Description:
-Supply; design; testing and commissioning of 8 baby care product line control panels as per client requirement

U-Shape Caravan Water supply pipe line project

Client: Proctor & Gamble Egypt
Scope Brief Description:
-Installing main pipeline to Caravan area
-Installing all required mechanical fitting; valves as per design drawing
-Installing required pipeline concrete support
-Doing required civil work for pipe routing
-Perform all required leakage; and hydro test after completion

Crusher Machine and core separation area

Client: Proctor & Gamble Egypt
Scope Brief Description:
-Removing old crusher machine from old place to a temporary one
-Doing required civil work for 2 Building of crusher and separation machine
-Doing all required steel structure and sheds
-Doing electrical installation for new rooms including lighting; power;
fire alarm installation; machine power receptacles
-Reinstating machines to new location